Create a Cost estimate before work
In Visuary, the Existing floor plan represents the existing layout ("the before"), while the Renovation floor plan lets you create your renovation proposals ("the after"). This distinction is essential, because the Cost estimate is generated from the differences between the two plans. In other words, every change made to the Renovation floor plan automatically creates lines in the Cost estimate, which you then just need to cost, adjust, and export.
Distinguish the Existing floor plan from the Renovation floor plan
In Visuary the Existing floor plan represents the existing layout. It should be as close to reality as possible:
Add all useful elements: power sockets, switches, cupboards, etc.
Specify the wall type.
Once the Existing floor plan is filled in, go to the tab Renovation floor plan.
The Renovation floor plan is the only place where you make your renovation proposals. All changes made will appear in the Cost estimate. The Cost estimate is created from this before/after concept, so it is essential to take it into account for the Cost estimate.
Check that the Renovation floor plan matches the same version of the Existing floor plan: if it does not, click the icon at the top right, just next to the save icon, to update the Renovation floor plan.
Understanding the lines in the Cost estimate
Every action performed on the Renovation floor plan automatically adds lines to the Cost estimate. You cannot change this behavior: one action on the plan always generates the same lines.
Identify an element in the Cost estimate from the plan

To identify the plan element linked to a line in the Cost estimate:
Hover over a line in the Cost estimate: the matching element will then appear in blue on the plan in 2D view.
Estimate each line
Change a price for all your projects
To change prices across all your projects:
In the Cost estimate, click on "To be costed" for the line you want
Enter the new price for the product in the dedicated field
To confirm, click the "Change the line for all my projects"
The price is automatically added to the Price grid and will now apply to all your projects, past and future.
Change a product price for all your projects
Method 1: Enter the sale price and the Installation price
To set a product price from the sale price and the installation price (for all your projects):
In the Cost estimate, click "To quote" for the line of your choice
Enter the "Sale price" and the "Installation price"
To confirm, click the button "Change the product for all my projects"
Method 2: Enter the purchase price and desired margin
To set the price of a supply item from the purchase price and margin (for all your projects):
In the Cost estimate, click on "To be priced" for the line of your choice
Enter the "Purchase price" and the "Margin": the sale price will be calculated automatically from this information
Enter the "Installation price"
To confirm, click the "Change the product for all my projects"
Change a price (this quote only)
To change prices on a single quote:
In the Cost estimate, click "To quote" for the line of your choice
Enter the new price for the product in the dedicated field
To confirm, click the button "Change only this line in this quote"
Change the VAT on an item
To change the VAT of an item in the Cost estimate:
Click "Cost estimate" on the right side of the screen
Select the VAT
In the box that appears, change the default rate to enter the information you want, either for all your projects or only for this quote.
Confirm the change by clicking the confirmation button for the desired scope:
"Change the line for all my projects" : the change will now apply to all your projects, for both future and past projects.
"Change only this line in this quote" : the change will apply only in this quote, for this plan Scenario.
Change the VAT used by default in the Cost estimate (all your projects)
To change the VAT used by default in your cost estimates:
From the home page, click the three lines at the top left to open the main menu
Click on "Configure the cost estimate"
Select the tab "Settings"
In the section "VAT rate", enter the new rate you want.
To confirm the change, click the button "Save"
Adjust the labels on each line
Change the text of a line (this quote only)
To edit the label of an induced line:
Click "Cost estimate" on the right side of the screen
Click the induced line of your choice
In the box that appears, edit the text label to enter the desired information, either for all your projects or only for this quote.
Confirm the change by clicking the confirmation button corresponding to the desired scope:
"Change the line for all my projects" : the change will now apply to all your projects, for all your future and past projects.
"Change only this line in this quote" : the change will apply only in this quote, for this plan scenario.
Rename a product (all your projects)
To rename a product (for all your projects):
Select the line linked to the product in the Cost estimate.
Change its name in the dedicated box.
The new name applies to all your projects.
Delete or add lines
The way the Cost estimate works, and the automatic addition of lines based on changes made to the plan, cannot be modified. However, you can customize the Cost estimate by adding, changing, or deleting lines.
Delete a line : hover over it, then click the trash icon on its right.
Bring back a deleted line : hover over it, then click the small arrow still on the right side of the Cost estimate.
Add a sub-item (for example, a trade discount): hover over the bottom of a section, then click the icon +.
Add an item in an existing section : click on "Add an item" at the bottom of the section.
Add a full section : go all the way to the bottom of the Cost estimate and click "Add a section".
Select the trades to display in the Cost estimate:
To select the professions you want to see appear in the Cost estimate:
From the home page, click the three small lines at the top left to open the main menu
Click "Configure the Cost estimate"
Select the tab "Settings"
In the section "profession", select the professions you want to see appear in the Cost estimate.
To confirm the change, click the button "Save"
Check that no line is "To be costed"
Once your plan is finished:
Review the Cost estimate and make sure no line is marked To be costed.
If you worked on several Scenario versions of the Renovation floor plan, do this check on each one.
Why check each Scenario? A price changed only for a Scenario quote does not carry over to the others. If you use the same products in Scenario A and Scenario B, but with a specific price entered for Scenario A, this price will not appear in the quote for Scenario B.
Export your Cost estimate
From the PDF report
To export the Cost estimate from the PDF report :
In the PDF Export, add a page "Budget envelope".
Choose its format: simple, or full (all lines appear in the "full" format).
Add the client's name and address.
Enter your legal information at the very bottom of the page.
Export to billing software
To export the Cost estimate to billing software:
Download the Export by clicking the 3 dots at the top right
Select "Exports" then "Export cost estimate (billing software)"
Then import the file into your billing software
Last updated

